FINLEY STREET · PORT COQUITLAM, BC

New drainage.
A complete surface renewal.

Drain tile and rainwater leader piping, additional sumps, new concrete with a channel drain and an asphalt driveway — brought together at this Finley Street home.

Completed Finley Street concrete patio with channel drain and new asphalt driveway
ARGYLL DEVCO / FINLEY STREET, PORT COQUITLAM

Drainage · Concrete · Asphalt

From the pipes below
to the finished surfaces.

Argyll Devco installed 150 linear feet of drain tile and rainwater leader (RWL) piping, along with a 1-inch waterline service upgrade from the water meter into the house foundation. The drainage work also included an additional yard sump and patio sumps.

The restoration included 700 square feet of concrete with a channel drain and an 800-square-foot asphalt driveway. The work also included 30 tons of disposal and backyard regrading, with gravel filled to match the surrounding dirt grade.

The project was completed in two weeks. Explore the installation and finished work in the 21 photos below.

Explore our drainage services and concrete services.

150 linear ftDrain tile and RWL piping
700 sq ftConcrete with channel drain
800 sq ftAsphalt driveway
30 tonsDisposal
Additional sumpsYard and patio drainage
2 weeksProject completion

02 / Sumps & surface drainage

Connecting the collection points.

03 / Concrete & grading

Preparing the finished surfaces.

04 / Finished project

Drainage and restoration, complete.

Let’s talk about your project

Planning a drainage
and restoration project?

Send your site address, photos, access details and the drainage, concrete or asphalt work you need priced.

Request a quote

Tell us a little about the job. Fields marked * are required.

We use these details to respond to your enquiry. FormSubmit delivers your request to our inbox. Privacy policy. For photos, text us or email us.